Long Gully Creek, Bendigo – Constructed wetland
The project is to treat runoff entering Long Gully Creek and divert water from the creek to ponds. The design was delivered in collaboration with RPEC Consulting. Civil Design Pty Ltd undertook all Civil Engineering design elements and plan production.
The main requirement of the project was minimising impact and preserving the ecological value of the area. The design has a natural feel with minimum pit and pipe work.
Client:
City of Greater Bendigo